GAS INSPECTION CHECK LIST

  • LOCATION:
    • Clear access; close to outside wall; close to plumbing; Code restrictions include: 3-ft from windows, doors, gas meter

  • CHIMNEY LINER:
    • For Conventional gas applications only

  • DEDICATED ELECTRICAL OUTLET:
    • For power vent plug-in; distance from tank location must not exceed 5ft;
    • NO extension cords permitted

  • FLOOR DRAIN:
    • Nearby – uncovered

  • VENTING:
    • Amount of venting pipe approved = 12ft.;
    • Indicate if any extra length required (see below)

CUSTOMER MUST PROVIDE: (at own expense)*
  • MIXER VALVE:
    • Building Code requirement for Plumbing; Regulation 23/04

  • SHUT OFF VALVE:
    • Customer must provide accessible gas line tie-in & shut off valve within 20-25 ft. (this belongs to the house)

  • ADDITIONAL VENTING / FITTINGS, etc.:
    • Customer to pay ESI Contractor if exceeds allowances (some room to move)

* Customer may use ESI Contractor for additional costs, or use their own contractor.

Note: galvanized fittings not permitted on gas line. Condensation rusts out – gas leak possible.